top of page

While performing a separate project for the Mayfield Independent School District that Woodall Roofing & Exteriors was contracted for, the district asked us to come up with a custom solution for the dome over their High School Gym. Due to the unique shape of a dome, we utilized a Duro-Last prefabricated PVC membrane system that allowed us to install prefab sections for a perfect fit. The system design and installation also featured permanent safety anchors as part of the system. This will allow for the safe inspection of the roof system, edge metal and gutters.
Project Gallery

bottom of page